I am told that the dates for resurfacing roads within Garth have now been finalised. The following will also be advertised in the local paper.
1. Shepherds Lane, Bracknell – From its junction with B3018 Binfield Road to its junction with Folders Lane. The anticipated start date for the re-surfacing is 10th August 2010 for a duration of 3 days.
The diversion route for this closure will be via B3018 Binfield Road, A329 Millennium Way and Bull Lane, or by this route reversed.
2. Merryhill Road, Bracknell – From its junction with Shepherds Lane to its junction with Horsneile Lane. The anticipated start date for the re-surfacing is 9th August 2010 for a duration of 2 days.
The diversion route for this closure will be via Shepherds Lane and Horsneile Lane, or by this route reversed.
3. Bull Lane, Bracknell – From its junction with Shepherds Lane to its junction with A329 Millennium Way. The anticipated start date for the re-surfacing is 2nd August 2010 for a duration of 2 days.
The diversion route for this closure will be via Shepherds Lane, B3018 Binfield Road and A329 Millennium Way, or by this route reversed.
4. Folders Lane, Bracknell – From its junction with Shepherds Lane to its junction with A3095 Warfield Road. The anticipated start date for the re-surfacing is 3rd August 2010 for a duration of 2 days.
The diversion route for this closure will be via Shepherds Lane, B3018 Binfield Road, Harvest Ride and A3095 Warfield Road, or by this route reversed.
5. Dukeshill Road, Bracknell – From its junction with Shepherds Lane to its junction with A3095 Warfield Road. The anticipated start date for the re-surfacing is 2nd August 2010 for a duration of 1 day.
The diversion route for this closure will be via Horsneile Lane, Shepherds Lane and B3018 Binfield Road, or by this route reversed.
Details of local Road Works can be found HERE
And HERE
No comments:
Post a Comment